Airport Rubber Removal Machine
Update time:Sep-02-2024
3 Levels of Thermo to ft your budget
Flip type rubber removal, road marking/line removal, friction improvement, and surface cleaning system
● Weifang Weichai Power Six Cylinder National Emission Standard II
● Rail jet module - special advanced nozzle cleaning module
● Equipped with a self dumping water tank
● Installation and truck upgrade
● Slow drive device
● Wear parts of starter kit
● Starter tool kit tool
● Video surveillance control system
● The shuttle module is installed on the front panel of the truck.
● The diesel engine is installed on the base frame of a truck in a soundproof container.
● The content of the vacuum tank is 6 tons, and the content of the freshwater side tank is 5 tons.
● The deceleration system will be controlled by the control lever on the driver's seat.
● Remove asphalt, concrete, anti-skid contact areas, and rubber layers with or without grooves.
● Remove excess road/line markings (paint, thermoplastic, hot ball plastics, cold plastic, and cold spray plastics.etc.) from asphalt, concrete, and non slip surfaces Improved friction coefficient.
● Clean the floor lamp.
● Surface cleaning/treatment (including removal of oil spills; cleaning of brackets/enclosures).
● The detachable flip type is designed as a modular ultra-high pressure water jet upper structure.
● The flip type nozzle shuttle module can be installed on the front mounting plate of the truck within a few minutes.
Maximum working width: 2000mm
Minimum ambient temperature:+2 ℃
Maximum working pressure: 2500bar
Water consumption: 85L/min
● Weifang Weichai Power Six Cylinder National II.
● Power200 high-pressure pump.
● All rooms are equipped with soundproofing facilities.
● Power: 255 kW.
● Speed: 1800r/min.
● Maximum working pressure: 2500 bar.
● Maximum flow rate: 85L/min.
● High voltage and hydraulic pipelines, traction chain control cables
● Automatic height adjustment of rotor nozzle
● Hydraulic driven rotary nozzle head and rotary transmission (initial equipment) Speedometer
● SPS centralized control and cable remote control
● Pre equipment kit video trajectory control system
◆ Pump speed ◆ Rotor speed
◆ Operating pressure ◆ Hydraulic high-pressure pump
◆ Water Preloading ◆ Program Selection
◆ Rotor power (speed) ◆ Rotor position (nozzle inspection program)
◆ Minimum crossing speed ◆ Fault record
● Transverse beam, aluminum structure
● Heavy duty rollers
● Hydraulic steering wheel stroke mechanism
● Hydraulic transmission device (crossbeam)
● Integrated positioning sensing mechanism in hydraulic cylinder
● Hydraulic proportional valve control
● Easy to maintain service points
● Operation manual, English CE certificate
● Maximum width of shuttle beam: 2m
● Working width: 2m
● Rotary disc diameter: 350mm
● The content of the vacuum tank is 6000 liters
● The water tank on the fresh water side has a capacity of 5000 liters when placed together
● All storage tanks are made of stainless steel
● The vacuum tank is tiltable, simplifying processing
Installation and loading level
In addition, for the installation and upgrade of trucks, all necessary conversion operations are as follows:
● Feedlines and bypass pipelines
● Hydraulic and electrical connections of the track injection control unit
● Front installation board
● Control panel bracket
● Emergency switch
Creep transmission device
Requirement, if the carrier is not equipped with appropriate slow motion:
● Speed range: 50m/h-2000m/h
● Powered by a low-speed, high torque radial piston hydraulic motor integrated into the rear axle universal joint
● In the drive shaft, it is engaged by a pneumatic clutch
● Driven by auxiliary engine
● Controlled by the main control unit
● The climbing ability of creep actuators is limited; Approximately 30 degrees, the vehicle weighs 35 tons.
Worn parts of starter kit
The first worn part is approximately 80 hours after operation.
Starting tool
The most important service, maintenance, and repair work needs to be carried out on the machine.
Video tracking control system
contain:
● SW-CCD cameras monitor the track in the front and rear
● Image display
Maintenance and operation training, initiation assistance
● Duration: 10 days
● Maximum operation training: 3 operators and 3 maintenance technicians. Excluding consultant's travel expenses, accommodation fees, and other expenses.
Related Suggestion
LXD Boost Vehicle (ride-on system)
LXD Boost Vehicle (ride-on system)
LXD400 Hydraulic Single Cylinder Thermoplastic Preheater
LXD400 Hydraulic Single Cylinder Thermoplastic ...
LXD900 Road Marking Remover
LXD900 Road Marking Remover
LXD-18L High Pressure Airless Cold Paint Spray Road Marking Machine
LXD-18L High Pressure Airless Cold Paint Spray ...
LXD300 Mechanical Single Cylinder Thermoplastic Paint Preheater
LXD300 Mechanical Single Cylinder Thermoplastic...
LXD Pre-marking Machine
LXD Pre-marking Machine